The Fourth Cap: PJM's December 2029/2030 Capacity Auction
Why the last collared auction is likely to clear at its ceiling again
PJM's base capacity auction for the 2029/2030 delivery year is likely to clear at its price cap for a fourth straight time, because the shortage that pushed the last three auctions to the ceiling has not closed and the backstop meant to close it has stalled at the regulator.

2 calls from this report, among 24 in Infrastructure & Catastrophe Risk.
Each line is one call in the domain, from the day it was written to the day it resolves. This report's calls are lit; point at any line to read it.
- CLM-2026-443The shortfall of capacity cleared in PJM's base residual auction for the 2029/2030 delivery year, with fixed resource requirement commitments, against that auction's reliability requirement, in MW.a range · resolves in 64 d
- CLM-2026-444PJM publishes the results of its base residual auction for the 2029/2030 delivery year on or before 31 December 2026.90% · resolves in 64 d
| ID | Statement | p | Made on | Resolves by | Status | Outcome |
|---|---|---|---|---|---|---|
| CLM-2026-443 | The shortfall of capacity cleared in PJM's base residual auction for the 2029/2030 delivery year, with fixed resource requirement commitments, against that auction's reliability requirement, in MW. | 3000 to 11000 MW (central 7000) | 2026-10-26 | 2026-12-31 | Locked | |
| CLM-2026-444 | PJM publishes the results of its base residual auction for the 2029/2030 delivery year on or before 31 December 2026. | 0.90 | 2026-10-26 | 2026-12-31 | Locked |
A claim is entered in the brief's own words and carries its publication date and the day it entered the ledger: the register's briefs on 8 September 2026, when the standard was first applied; the forward benchmark on the day it was locked. It resolves only against a dated public source. The scoring rule is on the Methodology page.
The capacity price in PJM is set at an administrative ceiling, because demand growth from large loads has outrun new supply and the shortfall against the reliability requirement has grown with each auction. The ceiling truncates a demand curve that would otherwise cross supply above it: the shortfall shows that, and PJM's simulation suggests by how much. The December auction runs under the same collar, with the same shortage and without the backstop supply that was meant to relieve it. A fourth cap clear is the likely outcome, and the real question for buyers and sellers is what happens to the price signal when the collar ends with this auction, unless state and federal affordability pressure, the stalled backstop or both bring a further extension.
Open-source intelligence current through 26 October 2026. The publication carries a 19-entry source registry, explicit confidence tags, limitations, and deterministic resolution rules for its forward claims.
The source tiers, estimative language, forward-claim rule, scoring, and corrections record are public on the Methodology page.