CLAIM · INFRASTRUCTURE & CATASTROPHE RISK
“Parametric policy language issued during the 2026 to 2031 NSRS transition window will need to specify which datum applies, with formal conversion provisions, or contractual triggers will drift from physical signals by the conversion offset. We expect this to become a standard policy-language addition by 2027.”
This claim comes from The Ground Underneath the Map, published on 26 May 2026, and entered the ledger on 8 September 2026. The firm put a probability of 0.65 on it: the chance the firm put on it being true, fixed when it was locked, about 65 in 100. It resolves by 31 December 2027, only against a dated public source.
Status
Where the claim stands on the ledger, the probability the firm locked, and the dates that govern it.
lockedStatus
0.65Locked probability
2027-12-31Resolves by
Locked means recorded and waiting. Its window is still running. Nothing in a locked claim is edited after the fact.
Extraction and settlement
Where the sentence came from, and the public source that decides it.
Where it was madePDF page 9 (printed p.8), Section 04 Assessment (MODERATE)
Window as statedby 2027
How it will be settledParametric policy forms and industry guidance (WTW, PwC, NAIC) showing datum-specification and conversion clauses as standard
Where the probability came fromConfidence band MODERATE on the judgment, mapped by the Methodology forward-claim standard (chapter 08, fixed 2026-09-08)
Band in the reportMODERATE
Record classlegacy prospective
Claim familyground-004; used to avoid presenting related claims as independent trials.
Learning roleoperational. Holdout claims may score publicly but never train the Learning Loop.
Extracted2026-09-08, against the forward-claim standard
The series it resolves against
The data series, if any, whose values settle the outcome.
This claim names no series the Dashboard carries; it resolves against the public source recorded with it.