CLAIM · MINING & MANUFACTURING
“The eurozone flash manufacturing PMI for November 2026, as first published.”
This claim comes from Europe's Industrial Recession Test, published on 12 October 2026, and entered the ledger on 12 October 2026. The firm locked a range of 50.6 to 53.8 index points with a central estimate of 52.3; a range item is scored by whether the published figure lands inside the band, outside the Brier rule. It resolves by 23 November 2026, only against a dated public source.
This call, in time
Written and locked12 Oct
Resolves by23 Nov
Today
On the Mining & Manufacturing Horizon
From the reportEurope's Industrial Recession Test12 October 2026 · AIG-MIN-26-008Its sibling calls
- CLM-2026-398The eurozone flash manufacturing PMI for November 2026 is at or above 50.0.85% · resolves in 42 d
- CLM-2026-400Euro area industrial production for August 2026 is higher than in July.65% · resolves in 3 d
- CLM-2026-401German total production in industry for September 2026 is lower than in August.65% · resolves in 29 d
- CLM-2026-402German production excluding energy and construction for September 2026 is unchanged or higher than in August.45% · resolves in 29 d
Status
Where the claim stands on the ledger, the probability the firm locked, and the dates that govern it.
lockedStatus
50.6 to 53.8 index points (central 52.3)Locked range
2026-11-23Resolves by
Locked means recorded and waiting. Its window is still running. Nothing in a locked claim is edited after the fact.
Extraction and settlement
Where the sentence came from, and the public source that decides it.
Where it was madethe Outlook of the PMR "Europe's Industrial Recession Test"
Window as stated23 Nov 2026
How it will be settledReuters: the value of the flash eurozone manufacturing PMI for November 2026 as Reuters first reports it, in index points, whatever the method.
Where the probability came fromLocked range of record from the approved PMR; scored by interval coverage, outside the Brier rule
Record classbrier native
Claim familyeurope-s-industrial-recession-test; used to avoid presenting related claims as independent trials.
Learning roleoperational. Holdout claims may score publicly but never train the Learning Loop.
Extracted2026-10-12, against the forward-claim standard
The series it resolves against
The data series, if any, whose values settle the outcome.
This claim names no series the Dashboard carries; it resolves against the public source recorded with it.